01
Bluff House
The whole west wall is a single 26-foot board-formed pour. The form boards were milled from the site’s own removed eucalyptus.
AIA San Diego Honor Award, 2024
Architecture & interiors San Diego Since 2011
We begin with the weather. Before a plan exists, we spend a season on the site.
See the five buildingsSan Diego, nowThe sun over 32.7°N
We begin with the weather. Before a plan exists we spend a season on the site, at different hours, writing down where the light lands and where the wind comes from. Everything after that is an argument with the ground. We are not interested in buildings that look like they could be anywhere. We are interested in a room you could not have built two hundred yards away.
Houses on bluff lots, a public library, a winery floor. Board-formed concrete, unfinished steel and reclaimed Douglas fir. Jump to the index of work.
01
The whole west wall is a single 26-foot board-formed pour. The form boards were milled from the site’s own removed eucalyptus.
AIA San Diego Honor Award, 2024
02
A 900 sq ft addition to a 1968 Halprin-era house. No new windows face the ocean.
You read with your back to the Pacific. You still know exactly where it is.
Public work
03
Rebuilt after the 2019 closure. The reading floor is one room with a 19-foot clerestory and no interior doors.
AIA San Diego Honor Award, 2021
A room you could not have built two hundred yards away.
04
A working crush pad by day. The tasting bar is the fermentation floor’s own poured slab, ground and sealed.
05
Two units, one chimney mass. The studio’s first built project using recovered Douglas fir.
| No. | Project | Place | Year | Type | Recognition |
|---|---|---|---|---|---|
| 01 | Bluff House | Encinitas, CA | 2024 | Residence | AIA San Diego Honor Award |
| 02 | Sea Ranch Reading Room | Sonoma County, CA | 2023 | Addition | — |
| 03 | Cardiff Branch Library | Cardiff-by-the-Sea, CA | 2022 | Civic library | AIA San Diego Honor Award |
| 04 | Ballard Canyon Tasting Room | Santa Ynez, CA | 2021 | Winery | — |
| 05 | Ocean Beach Duplex | San Diego, CA | 2019 | Two dwellings | — |
How long a commission takes
Projects run 18 to 36 months and $2M to $9M. The first months are spent outdoors.
What we build with
A first conversation is an hour, on your lot if you will have us, at whatever time of day the light is doing something. Bring the survey if you have one. Tell us which of our buildings made you write.
studio@okadahall.example2015 Kettner Boulevard
San Diego, CA 92101